Karachi: Sindh Energy Minister Imtiaz Ahmed Shaikh has announced that the trial run started for generating an additional 1320 Mega Watt (MW) of electricity from the Thar coal power plant that will be included in the national grid soon. According to Sindh energy minister, while talking about the full potential of the coal power project said that a total of 2640 MW of electricity will be supplied to the National Grid from Thar coal soon.

Leave a Reply

Your email address will not be published. Required fields are marked *

You May Also Like

Pakistan’s current account in surplus

Pakistan’s current account posted a surplus of $654 million in March after…

Rupee value keeps shrinking

Karachi: On May 25, the Pakistani rupee dropped to a historic low…

Apple to use 100% recycled cobalt in batteries

Apple said that it would use 100 percent recycled cobalt in all…